Mid-Canal

We had a pleasant run down the lakes and into the start of the cut eventually anchoring near the dredging base. All done in the dark.

This is the view in the morning, the Pilot was determined to anchor close to the dredge despite their objections. The next morning they chased us off so we picked up the anchor and moved a 100 metres.

The dredge

thumb_IMG_1893_1024

Looking back along the canal, we moved from this position to a position between these and the next set of mooring buoys. Another dredge in the background with an east bound tanker behind. The dredging base to the right. There was 4 dredges working along this short stretch.

thumb_IMG_1889_1024

Looking across the canal. The train crossing the bridge is carrying containers across the isthmus. The larger container ships discharge one side, the containers are railed over and loaded on another container ship. Now the large locks are open and the canal wider the ships may go back to transiting the canal.

thumb_IMG_1892_1024

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s